ContentsAbout LlewellynHistory of LlewellenPhilosophyCustom Building and PositioningGallery
Products and ServicesA trip in the crafting of a Llewellyn BicycleMarterials and PartsContact Information

 45 items in this album on 5 pages  [slideshow] [login] 
 Gallery: Llewellyn Bikes Gallery  Album: May they be joined in unison. Long live the Lug! Llewellyn's investment cast stainless steel handle bar stem lugs   
      1  2  3  4  5   Next Page Last Page

1. A pair of lugs
Viewed: 118 times.
2. Clean edges on emery cloth sheet on a flat surface
Viewed: 101 times.
3.Cut through lug gap
Viewed: 122 times.
4. Quick clean up the gap with warding file
Viewed: 116 times.
5. Smooth out bar clamp
Viewed: 105 times.
6. Chase M6 bar binder boss
Viewed: 103 times.
7. Dress edges
Viewed: 110 times.
8. Cut and clean up gap in fork lug
Viewed: 118 times.
9 B. Mount on 28.6mm tube
Viewed: 112 times.
      1  2  3  4  5   Next Page Last Page
 Gallery: Llewellyn Bikes Gallery  Album: May they be joined in unison. Long live the Lug! Llewellyn's investment cast stainless steel handle bar stem lugs   
Powered by Gallery v1.3
web design by startgrid multimedia